The Mount Coffee Hydropower Project is a hydroelectric project in the West African nation of Liberia on the Saint Paul River. Built in 1966 with additional phases completed later, the project had a maximum generating capacity of 64 MW. The Walter F. Walker Hydro Dam and generating facilities were extensively damaged during the First Liberian Civil War and are not currently functioning. ==History== In 1963, the Liberian government received a loan from the World Bank to develop a USD $24.3 million hydro electric project.〔(【引用サイトリンク】title=History )〕 Construction of the facility began in 1964 by the Monrovia Power Authority using Raymond Concrete Pile Company as the contractor and Stanley Consultants as the project managers.〔 In 1966, the power company completed the initial phase of the dam and began generating electricity.〔(First State of the Environment Report for Liberia – 2006. ) United Nations Development Programme. 2006, p. 44–45. Retrieved on October 19, 2008.〕 The project was finished in 1967 and named the T. J. R. Faulkner W.F. Walker Hydroelectric Power Station.〔 Initial generating capacity was 30 MW produced by two turbines, which was increased to 64 MW when two more turbines were added in 1973.〔 The Monrovia Power Authority became the Liberia Electricity Corporation on July 12, 1973.〔 In June 1990, the government announced plans to more than double the electricity generating capacity of the project and adding a reservoir to allow more generation during the dry season.〔"Liberia expands hydropower", ''Engineering News-Record'', June 7, 1990. McGraw-Hill, Inc., Vol. 224, No. 23; p. 27.〕 The plans called for a new dam to be built upriver on the Via River to provide storage capacity, while two 52 MW turbines would be added at the existing power generating plant.〔 The US$300 million expansion was never begun due to the Civil War.〔 In July 1990, rebel forces under the command of Charles Taylor seized the dam and shut off power and water to Monrovia.〔Huband, Mark. "Retreating Liberian rebel leader urges peace talks" United Press International, October 7, 1990.〕〔"Worldwide: Liberia blackout", ''The Independent'', July 1, 1990, Foreign News Page, p. 14.〕 During this First Civil War, the project’s intake dam was destroyed on one end while the rest received other damage.〔(Desk Study on the Environment in Liberia. ) United Nations Environment Programme. 2004, p. 30. Retrieved on October 19, 2008.〕 Other parts of the facilities were looted and destroyed in later years of the conflict.〔 Beginning in early 2005, proposals were made to repair the facility and restore power,〔The Analyst. "Liberia; Liberian Engineer Presents Project For Hydro Dam Construction, But Faces Stone Wall", Africa News, January 4, 2005.〕 including a proposal by China.〔"Weekly Recap", Power, Finance and Risk, March 25, 2005.〕 The United States Trade and Development Agency gave $400,000 to Liberia in February 2007 to study rebuilding and expanding the project.〔(Liberia’s Post-War Recovery: Key Issues and Developments. ) Congressional Research Service. Retrieved on October 19, 2008.〕 The study showed no structural damage to the dam, but that most of the project’s facilities would need to be rebuilt at a cost of US$383 million. As of August 2008, the Liberian government was considering privatization of the project for a fixed number of years as the nation did not have the resources to fund the repair.〔 In May 2012, the Mt. Coffee Hydropower Rehabilitation Project was initiated with a series of surveying and engineering assessments of the feasibility of revitalizing the plant. This work culminated with the signing of a contract in April 2013 with a Norwegian company (Norplan AS) and a German company (Fichtner GmbH) to revitalize the defunct power-plant by 2015.〔 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Mount Coffee Hydropower Project」の詳細全文を読む スポンサード リンク
|